Sitework estimating on one estimate, across every scope on the site

A site is not one activity. It is clearing, stripping, cut, trench, grade and haul-off, each with its own unit, its own crew and its own production. EARTHVOQ prices them separately and totals them once.

14 days. No card.

Estimate — Northgate Retail6 scopes, one site
  • Clear and grubAC
  • Strip topsoilCY
  • Mass excavationCY
  • Utilities trenchLF
  • Subgrade and fine gradeSY
  • Haul-off and disposalCY

A site is more than one activity

The mistake that costs money on sitework is pricing the whole site at one blended rate. Clearing and fine grading do not consume the same crew, the same machine or the same hours per unit, and averaging them hides whichever one is going to hurt.
  • Clear and grub

    AC

    By area, with disposal of what comes off

  • Strip topsoil

    CY

    Stockpiled, not exported — priced differently

  • Mass excavation

    CY

    Cut, fill and the balance between them

  • Utilities trench

    LF

    By section, with bedding and backfill

  • Subgrade and fine grade

    SY

    Where the labor content jumps

  • Haul-off and disposal

    CY

    By cycle and tipping fee

Takeoff for a site, not for a shape

Six scopes means six sets of quantities off the same plan set, each on its own layer and each in its own unit.
Quantities by scopeSheet C-2 and C-4

Clear

4.2 AC

Strip

6,800 CY

Cut

21,400 CY

Trench

2,940 LF

One calibration, every layer

The scale is set once per sheet and every measurement on it inherits it. Layers are named after your scopes, so the totals arrive already sorted the way you will price them.

The measurement side has its own page — earthwork takeoff — and it is the same tool.

Rates per activity, not per job

Your own crews and machines, assigned where they actually work.
Priced by scopeNorthgate Retail

Clear and grub4.2 AC$18,900

Strip topsoil6,800 CY$27,200

Mass excavation21,400 CY$164,780

Utilities trench2,940 LF$91,140

Fine grade38,600 SY$46,320

Haul-off9,100 CY$167,440

Direct cost$515,780

One estimate, priced by scope

And when the job is won, the same six scopes become the six budgets it is measured against.

That means the overrun shows up on the scope that caused it. On a site job that matters more than anywhere else: the trench can be 30% over while the mass excavation carries it, and a single job-level number would show you nothing at all.

Price a site the way it will actually be built.

Fourteen days, no card, and nothing filled in on your behalf.