A site is more than one activity
Clear and grub
ACBy area, with disposal of what comes off
Strip topsoil
CYStockpiled, not exported — priced differently
Mass excavation
CYCut, fill and the balance between them
Utilities trench
LFBy section, with bedding and backfill
Subgrade and fine grade
SYWhere the labor content jumps
Haul-off and disposal
CYBy cycle and tipping fee
Takeoff for a site, not for a shape
Clear
4.2 AC
Strip
6,800 CY
Cut
21,400 CY
Trench
2,940 LF
One calibration, every layer
The scale is set once per sheet and every measurement on it inherits it. Layers are named after your scopes, so the totals arrive already sorted the way you will price them.
The measurement side has its own page — earthwork takeoff — and it is the same tool.
Rates per activity, not per job
Clear and grub4.2 AC$18,900
Strip topsoil6,800 CY$27,200
Mass excavation21,400 CY$164,780
Utilities trench2,940 LF$91,140
Fine grade38,600 SY$46,320
Haul-off9,100 CY$167,440
Direct cost$515,780
One estimate, priced by scope
That means the overrun shows up on the scope that caused it. On a site job that matters more than anywhere else: the trench can be 30% over while the mass excavation carries it, and a single job-level number would show you nothing at all.
Related EARTHVOQ capabilities
- Open →
Earthwork estimating
Cut and fill quantities, your production rates, and a cost you can defend.
- Open →
Earthwork takeoff
Measure cut, fill and excavation straight off the PDF plan.
- Open →
Job costing
The estimate becomes the budget, and the field fills in the actual.
- Open →
Excavation contractors
One system from bid to final cost, for an excavation company.
Price a site the way it will actually be built.
14 days, no card. Plans from $79 a month.